Upgrade of Highway 90 – From the Ecological Beach to the Field School
The project involved the upgrade of Highway 90 along the section between the Ecological Beach and Nahal Shlomo, with the goal of improving road safety, infrastructure quality, and traffic flow along one of Eilat’s primary transportation corridors.
The scope of work included earthworks, asphalt paving, road base construction, curb installation, drainage infrastructure, street lighting, utility upgrades, and environmental landscaping. All works were carried out to the highest standards of quality, safety, and engineering excellence.
The completed project has significantly enhanced the driving experience, strengthened the region’s transportation infrastructure, and provided a safer, more efficient, and long-lasting roadway for both residents and visitors.


